H2air GT now operates the new Tulipes windfarm (Somme), which won the first french wind public tender bid. There are nine Vestas V126 turbines and one V117 with a total capacity of 36 MW.
H2air GT teams took over the turbines, set up on February 1, 2021.
The windfarm is connected to HTA/HTB network (225 kV) with Tulipes connection station, built by H2air group. This station will be operated by Somme SICAE, in partnership with H2air GT.
Our windfarm managers are responsible for the compliance of the electric sites with the legal requirements. Our team uses the latest big data technologies to make an optimal running from the start.